All technical and aesthetic requirements are collected to define the project scope, timelines and desired outcomes.
An initial cost estimation is prepared based on the defined scope, materials, labour and logistics. All components are itemised to provide maximum clarity, always within the usual margins of a project of this nature.
A complete project plan is defined, aligning key factors such as haul-out schedule, paint system selection, refit-contractor coordination and the scheduled launch date.
Daily progress is monitored to ensure that onsite teams, timelines, resources and procedures remain fully aligned.
Each phase undergoes technical checks including surface condition, environmental parameters and coating integrity.
A detailed final report consolidates executed procedures, measurements, inspections and photographic evidence.
Full project traceability through an online folder —
all documents, processes, and execution evidence in
one place
A detailed plan is outlined, specifying procedures, sequencing and technical requirements to ensure a controlled and predictable workflow.
All tools, platforms and protection systems are prepared and installed according to project needs, guaranteeing safe and efficient working conditions.
Coating, preparation and application procedures are performed following verified methods to ensure consistency, adhesion and finish quality.
Post-execution checks verify system performance, document results and confirm that all warranty and specification requirements are fully met.
To provide the best experiences, we use technologies such as cookies to store and/or access device information. Consenting to these technologies allows us to process data such as browsing behavior or unique identifiers on this site. Not consenting or withdrawing consent may negatively affect certain features and functions.